Early civil works contract at Corunna Downs mine awarded

Atlas Iron Pty Ltd has awarded MACA Limited a $38 million contract for early civil works at the Corunna Downs Iron Ore Project located in Western Australia’s Pilbara region. “MACA is delighted to have been awarded these early civil works for Atlas demonstrating the civil capability within our end to end mining service offering.

get price

Projects NRW Mining and Civil

roy hill iron ore project package 1 mine process plant (civil works) pit 1 stage 2 preload works ranger mine. forrestfield–airport link. kestrel mine ventilation shaft civil works. solomon trinity overpass. nammuldi waste fines storage facility stage 2 civil works. yandi oxbow.

get price

KARARA IRON ORE PROJECT NRW Mining and Civil

LOCATION. 500 kilometres north east of Perth and. 225 kilometres east of Geraldton, Western Australia. STATUS. Complete. PROJECT DESCRIPTION. Representing the largest major concrete works package NRW has undertaken to date, the project encompassed most of the preliminary construction work for the iron ore crushing and processing facility.

get price

Our Projects BG&E Resources Competency Capacity

BGER were commissioned by Decmil to conduct the civil and structural detailed design for the Separable Parts 1 and 2 of the Silvergrass Project iron ore deposits. BG&E’s design considered all Client operational requirements for access and traffic flow whilst maintaining designated ‘HV and ‘LV’ zones to minimize vehicle interaction.

get price

$230m mining contract for WA Corunna Downs project awarded

Projects MACA Civil to deliver works on $3.7bn Iron Bridge project in WA MACA Civil has been awarded a $26 million contract to deliver bulk earthworks on the $3.7 billion Iron Bridge Magnetite Project in Western Australia that is being developed by Fortescue Metals Group’s (FMG) subsidiary FMG Magnetite and joint venture partner Formosa Steel.

get price

PROJECTS Platinum Surveys Pty Ltd

Iron Ore Projects, Supply Base Warehouse, Roy Hill Earth Works, Airstrip and Internal Roads, Sino Iron Ore Projects, Pluto LNG Project, Woodside, Eastlink, Yandi Area C, Geraldton Southern Transport Corridor. Site A and Site B Civil Works Client’s Representative Foster Wheeler Worley Parsons

get price

Projects Booi Holdings

Compilation and control of detailed planning programmes using MS project and Sciforma. Construct schedules based on the design, specification, working instruction, work plan or word of mouth. Assessing, updating, monitoring and reporting on progress. Liaising with different stakeholders to determine the completeness of the project scope.

get price

Projects Aquila Resources

Aquila's two major bulk commodity projects are the West Pilbara Iron Ore and Eagle Downs Metallurgical Coal. West Pilbara Iron Ore Project. Stage 1 area is 70km south of Pannawonica in the Pilbara region of Western Australia. The West Pilbara Iron Ore Project ("WPIOP") is one of the largest independently owned undeveloped direct shipping iron

get price

Structures, Marine Structures, Industrial Structures

Kudremukh, Karnataka, India Client: Kudremukh Iron Ore Company Ltd., Bangalore Civil Works for Iron Ore Projects, civil and piling work for the filter building, shops and warehouse, office building, main substation, fire station, water treatment plant, thickness conveyer gallery, and transfer towers, surge silos and other allied works. 340 PCC cast-in-situ vertical bored piles of

get price

GVS construction company,mechanical works,civil works

RVPR Constructions private limited in the year 2010. RVPR is one of the fastest growing construction and engineering companies specializing in

get price

Early civil works contract at Corunna Downs mine awarded

Atlas Iron Pty Ltd has awarded MACA Limited a $38 million contract for early civil works at the Corunna Downs Iron Ore Project located in Western Australia’s Pilbara region. “MACA is delighted to have been awarded these early civil works for Atlas demonstrating the civil capability within our end to

get price

KARARA IRON ORE PROJECT NRW Mining and Civil

LOCATION. 500 kilometres north east of Perth and. 225 kilometres east of Geraldton, Western Australia. STATUS. Complete. PROJECT DESCRIPTION. Representing the largest major concrete works package NRW has undertaken to date, the project encompassed most of the preliminary construction work for the iron ore crushing and processing facility.

get price

civil works Archives International Mining

MACA wins early civil works contract at Atlas Iron Corunna Downs project 17th March 2020 Mineral project development,Mining maintenance,Mining services,Steel and iron ore Atlas Iron,BHP,civil works,Corunna Downs,Eastern Ridge,Iron ore,MACA,Mike Sutton,Pilbara,

get price

Case Study Nammuldi – Rail Extension Civil Works

The Rio Tinto (RTIO) $2 Billion dollar Nammuldi Below Water Table Project is located approximately 60 km north-west of Tom Price within the West Pilbara region of Western Australia. The Lycopodium rail team delivered detailed design and documentation of the rail extension civil works to the mine. Nammuldi’s annual Iron Ore production target

get price

Clough Awarded Construction of Koodaideri Rail Northern

Apr 30, 2019 April 30, 2019. Currently celebrating its 100th year of operation, Engineering and Construction Company, Clough, as part as the Acciona Clough joint venture, is pleased to announce that it has been awarded a civil works contract for the construction of the northern rail formation for the Rio Tinto Iron Ore Koodaideri Project.

get price

Gudai-Darri Northern Rail Formation Clough

Clough, as part as the Acciona Clough joint venture, is pleased to announce that it has been awarded a civil works contract for the construction of the northern rail formation for the Rio Tinto Iron Ore Gudai-Darri Project. The Gudai-Darri Project is a greenfield mine development for Rio Tinto Iron Ore, in the East Pilbara mining region.

get price

Civil works contract awarded for part of $3.5B metal project

Jun 03, 2019 A well-established mining, engineering and construction company has won a tender for part of a $3.5 billion metal project in Western Australia’s Pilbara region. A Joint Venture between Acciona a global leader in sustainable solutions for infrastructure and renewable energy, and Clough recently secured the civil works contract for Rio Tinto’s Koodaideri Iron Ore Project, []

get price

Completed Projects sipil.in

• Construction of Approach Road Package VI − for Kumaraswamy Iron Ore Mining Project at NMDC Limited, Donimalai, Bellary, Karnataka Value of work:Rs. 47.82 Crores. • Civil works of 220/132/33KV Substaion at IFFCO Sez, Racharlapadu in Nellore District for Amara Raja.

get price

Our Projects BG&E Resources Competency Capacity

BGER were commissioned by Decmil to conduct the civil and structural detailed design for the Separable Parts 1 and 2 of the Silvergrass Project iron ore deposits. BG&E’s design considered all Client operational requirements for access and traffic flow whilst maintaining designated ‘HV and ‘LV’ zones to minimize vehicle interaction.

get price

List of Mining Civil Services Projects in WA Cordell

ABYDOS IRON ORE PROJECT. Operating Mine Iron Ore project at 85km West of, Marble Bar, WA 6760 in the Mining Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards). Upgraded resource estimate of 22.2Mt @ 56.7% Fe.

get price

Civil and Concrete Archives Centrals

Hope Downs Iron Ore Project. Civil & Concrete Works for Crushing Mills, Product Handling, Stacker Beams and Train Load Out. Primary Crusher: Construction of reinforced concrete primary crusher foundation (major), walls, soffits, beams, counter lever slab, wing walls, and run on slab at Rom level.

get price

Tenders: Expression of Interest: Beneficiation Plant/Civil

Expression of Interest: Beneficiation Plant/Civil Works/Power Plant/Infrastructure Works/Logistics for Iron Ore Mining Project, Liberia, West Africa Iron Ore Mining Project Vedanta Resources Proudly Researched by: Melanie Miles Created on: 19

get price

Projects Hicks Civil and Mining

Company: Hamersley Iron for Rio Tinto Iron Ore Project Start: April 2011 Project Completion: February 2012 Project Description: Relocation of the existing Cape Lambert landfill, including excavation, sorting, classification and offsite disposal of the existing landfill cell, as well as the bulk earthworks, roadworks and drainage works associated with the construction of a new Class 1 landfill

get price

Civil Engineering Archives DIG IG

Tonkolili Iron Ore Mine. Project involving installation of infrastructure for a multi million tonne iron ore mine and processing plant, including design and construction of RC foundations, RC Weirs, pre-cast concrete works, reinforced soil walls, traditional earth tailings dams and several kilometres of roads []

get price

MACA wins early civil works contract at Atlas Iron Corunna

Mar 17, 2020 MACA wins early civil works contract at Atlas Iron Corunna Downs project. MACA is to upgrade an existing public road and develop access road at the Corunna Downs iron ore project following a contract award from Atlas

get price

civil works Archives International Mining

MACA wins early civil works contract at Atlas Iron Corunna Downs project 17th March 2020 Mineral project development,Mining maintenance,Mining services,Steel and iron ore Atlas Iron,BHP,civil works,Corunna Downs,Eastern Ridge,Iron ore,MACA,Mike Sutton,Pilbara,Western Australia Daniel Gleeson

get price

Case Study Nammuldi – Rail Extension Civil Works

The Rio Tinto (RTIO) $2 Billion dollar Nammuldi Below Water Table Project is located approximately 60 km north-west of Tom Price within the West Pilbara region of Western Australia. The Lycopodium rail team delivered detailed design and documentation of the rail extension civil works to the mine. Nammuldi’s annual Iron Ore production target

get price

Projects DIG IG

Tonkolili Iron Ore Mine . Project involving installation of infrastructure for a multi million tonne iron ore mine and processing plant, including design and construction of RC foundations, RC Weirs, pre-cast concrete works, reinforced soil walls, traditional earth tailings dams and several kilometres of roads including corrugated steel culverts

get price

Completed Projects sipil.in

• Construction of Approach Road Package VI − for Kumaraswamy Iron Ore Mining Project at NMDC Limited, Donimalai, Bellary, Karnataka Value of work:Rs. 47.82 Crores. • Civil works of 220/132/33KV Substaion at IFFCO Sez, Racharlapadu in Nellore District for Amara Raja.

get price

PROJECTS Platinum Surveys Pty Ltd

Iron Ore Projects, Supply Base Warehouse, Roy Hill Earth Works, Airstrip and Internal Roads, Sino Iron Ore Projects, Pluto LNG Project, Woodside, Eastlink, Yandi Area C, Geraldton Southern Transport Corridor. Site A and Site B Civil Works Client’s Representative Foster Wheeler Worley Parsons

get price

Structures, Marine Structures, Industrial Structures

Kudremukh, Karnataka, India Client: Kudremukh Iron Ore Company Ltd., Bangalore Civil Works for Iron Ore Projects, civil and piling work for the filter building, shops and warehouse, office building, main substation, fire station, water treatment plant, thickness conveyer gallery, and transfer towers, surge silos and other allied works. 340 PCC cast-in-situ vertical bored piles of

get price

Mining McCaw's Drilling & Blasting Ltd.

MINING Controlled blasting to aid in the extraction of natural resources such as iron ore, diamond, gold, coal. 40+ Years of Expertness Past mining projects include: Mining projects at Equity Silver Mines and Endako Mines at Houston, BC Mining projects at Lynn Lake, Manitoba Mining projects at B

get price

Projects NRW Holdings

SOUTH FLANK BULK EARTHWORKS & CONCRETE. YARWUN CIVIL WORKS. RANGER TAILINGS STORAGE FACILITY. KESTREL MINE VENTILATION SHAFT CIVIL WORKS. YANDI SUSTAINING PROJECT STAGE 1. NAMMULDI BWT WASTE FINES STORAGE FACILITY STAGE 2. RAVENSTHORPE HEAVY HAULAGE ROUTE. SOLOMON KINGS VALLEY TSF1

get price

Home Booi Holdings

Booi Holdings is a family-managed and wholly-black owned company. Based in South Africa, the company has been operating since 2005. With years of lucrative individual and combined experience in the field of its operation, Booi Holdings is well positioned to expand its success. Services include project management, planning and scheduling; civil/building services,

get price

Civil and Concrete Archives Centrals

Hope Downs Iron Ore Project. Civil & Concrete Works for Crushing Mills, Product Handling, Stacker Beams and Train Load Out. Primary Crusher: Construction of reinforced concrete primary crusher foundation (major), walls, soffits, beams, counter

get price

Our Policies Mobile Concreting Solutions

Karratha Projects. Karratha Leisure Centre Project; Jingarri Estate Civil Works; Jingarri Estate Workers Accommodation Camp; Rio Tinto Iron Ore Employee Housing Project; Karratha City Centre Master Plan Upgrades; Rio Tinto Iron Ore Parker Point Fuel Storage Facility Upgrade; Rio Tinto Iron Ore 7 Mile Power Station Upgrade; Tambrey Estate Civil

get price

Strike closes in on final approvals for Paulsens East iron

Jun 28, 2021 Paulsens East is expected to generate pre-tax cashflow of $167m over its first four years from production of 6 million tonnes of iron ore. Internal rate of return and net present value, both measures of a project’s profitability, were estimated at 213 per cent and $140m respectively.

get price

Ralph Christie Certified Engineer Anglo American South

Anglo American Kumba Iron Ore Projects (MHSA 2.13.3.1) Legally appointed for project construction of: SWEP Project 35km railway line including earthworks and civil works (substations, bridge crossings, signalling, OHL, pipelines, etc.) Tanks: 2 x 1.5 Million litres diesel tanks UHDMS Plant: 50 t/h ultra high dms plant Workshop and office